Urban Mass Transit Company Pvt. Ltd. (UMTC)
Pune BRT Corridor (Phase 2)
The project involved the preparation of general alignment drawings (GAD), good for construction (GFC) drawings, and signal planning for three BRTS Corridors for Pune Municipal Corporation, totaling 35.5 km. The tasks included site studies to formulate design solutions, conceptual corridor alignment with bus shelter locations, preparation of GAD drawings, cross-section and detailed junction design, signal phasing and designing, and development of final goods for construction drawings.
The three corridors for this phase of BRT Development in Pune were:
Nagar Road
Alandi Road
Sangamwadi Road